Emerson fournit à BP des services de maintenance prédictive et de soutien opérationnel en mer du Nord


BP Clair Ridge

Emerson will provide predictive maintenance and operational support services under a new, five-year contract, to ensure safe, optimized production for BP’s Clair Ridge platform (shown here) and Glen Lyon floating production, storage and offloading (FPSO) vessel. Photos courtesy of BP.​​​​​​​ High resolution image


Following safe start-up of Clair Ridge, Emerson to enable remote monitoring and provide real-time data to maximize production for UK offshore assets

AUSTIN, TEXAS (May 6, 2019) – Emerson (NYSE: EMR), a global technology and engineering leader, has been awarded a five-year contract with BP to provide predictive maintenance and operational support services to ensure safe, optimized production from its Clair Ridge platform and Glen Lyon floating production, storage and offloading (FPSO) vessel.

As main automation contractor for the Clair Ridge project, which achieved first oil at the end of 2018, Emerson was responsible for implementing its advanced integrated control and safety systems, and measurement and control devices to ensure safe, efficient operation of the two bridge-linked platforms. BP used Emerson’s Project Certainty methodology and consulting to define project goals that would eliminate costs, reduce complexity and risk, and accommodate late-stage changes. 

Using the latest technology, Emerson’s cloud engineering services enabled global project personnel to remotely collaborate on design, development and testing in a common virtualized environment. This allowed project changes and testing to be managed efficiently and remotely, reducing travel, time, costs and project risk. 

Emerson trained BP operators using its new, high-fidelity dynamic simulation model, enabling them to experience real-world scenarios before the system went live. This prepared them to effectively handle abnormal situations and resolve any operational issues that might have delayed reaching first oil. 

“This is another example of our collaboration with BP and commitment to combining proven technologies and the best expertise to help ensure safe, optimized production for many years to come,” said Lal Karsanbhai, executive president of Emerson’s Automation Solutions business.

Emerson’s ongoing operational support, remote monitoring and predictive maintenance for Clair Ridge and Glen Lyon rely on Emerson’s Plantweb™ digital ecosystem technologies, software and services which equip plant personnel with relevant, real-time production data and analytics. This includes its DeltaV™ integrated control and safety systems, AMS asset management software, and measurement and control devices, all helping BP locally control operations, while remotely monitoring production and asset health from an onshore location.

Clair Ridge is a multibillion-pound investment developed by BP and its co-venture partners ConocoPhillips, Chevron and Shell. Construction of the platforms was completed in 2016, with first oil announced on November 23, 2018. Clair Ridge is designed for 40 years of production. The development is targeting 640 million barrels of oil reserves, with peak production expected to be around 120,000 barrels of oil per day.

For more information, visit Emerson.com/Offshore

Presse :
• Contacts : Contacts presse monde pour Emerson

Ressources supplémentaires :
• Rejoignez la Communauté Emerson Exchange 365
• Suivre Emerson sur Twitter Facebook LinkedIn YouTube

À propos d’Emerson 
Située à Saint-Louis dans le Missouri (États-Unis), Emerson (NYSE : EMR) est une société internationale de technologie et de logiciels, qui propose des solutions innovantes aux industries. Grâce à son portefeuille de produits d’automatisation de pointe, dont sa participation majoritaire dans AspenTech, Emerson aide les fabricants de produits hybrides, de procédés et discrets à optimiser leurs opérations, à protéger le personnel, à réduire les émissions et à atteindre leurs objectifs de développement durable. Pour en savoir plus, rendez-vous sur Emerson.com.

Activez JavaScript pour utiliser ce site Web.