
The best time to plan a major upgrade is before you have to.
A planned upgrade runs on your schedule — around your turnaround windows, at the scope your site requires, with the resources to do it right. Upgrading now means moving to DeltaV Version 16.LTS on your terms, not under pressure.
Your system is also running on a Microsoft operating system that is past end-of-support. Version 16.LTS resolves that — a current security posture, on a fully supported platform — as part of the same project.
What your system looks like on Version 16
Supported Microsoft operating system | — | ✓ |
ISASecure SSA Level 1 certification | — | ✓ |
Integrated Patch Management | — | ✓ |
Electronic Marshalling (CHARMs) | — | ✓ |
DeltaV Live HMI | — | ✓ |
IQ Controller | — | ✓ |
DeltaV Flex (flexible licensing) | — | ✓ |
Edge Environment | — | ✓ |
Field wiring and I/O | ✓ | ✓ |
Control strategy and logic | ✓ | ✓ |
Configuration and tuning | ✓ | ✓ |
Operator familiarity and alarm philosophy | ✓ | ✓ |
✓ New/Carries forward — Not available
Lifecycle Assessment
Site-specific working session that produces a written upgrade roadmap built around your schedule and turnaround windows.
Cybersecurity Assessment
Documents your current security posture and maps what a supported, patched platform looks like for your site.
Your upgrade path starts with your site.
A Lifecycle Assessment is a working session built around your specific system, schedule, and scope — not a sales presentation.